1050 aluminum strip

TMR ALUMINUM supplier of 1050 aluminum strip supplier and manufacturer

1050 aluminum strip

Alloy 1050 A1050
Temper O H14 H24 H26
Width 5mm up
Thickness 0.005mm up
Port of Loading Qingdao SHANGHAI Ningbo
Price Chat With Us

The first choice is to choose an aluminum coil with a suitable thickness. Before processing, make sure that the thickness of the aluminum coil cannot be mistaken, and then arrange the slitting machine, and control the slitting width of the slitting equipment according to the actual width. If it can be controlled well, the width tolerance can be controlled within 0.05mm. The slitted aluminum strip needs to ensure that the width is different, the edge parts are uniform, and there should be no burrs.

We can process and cut aluminum strips of different lengths and widths according to the actual needs of customers.

Chemical composition of 1050 aluminum strip

Grade Si Fe Cu Mn Mg Cr Ni Zn Al
1050 0.25 0.4 0.05 0.05 0.05 - - 0.05 99.5

 

Aluminum products of TMR meet the export popular

Plastic movie and brown paper can be protected at customers’ need. Also timber case or timber pallet is adopted to shield products from harm for the duration of the delivery.

There are styles of packaging, which is eye to wall or eye to sky. Customers can choose either of them for their convenience.

1. What's the MOQ?
Usually, CC materials for 3 tons, DC materials for 5 tons, some special products are different, pls consult our salesman.
2. What's the payment term?
LC ,TT
3. What's the lead time?
Common specification 10 -15 days, others 30 days or so.
4. How about the packaging?
Standard export packaging, wooden cases or pallets.
5. Could you send us the free sample?
Yes, the small pieces can be provided for free, but the buyer need to bear the freight charges.

Why Choose TMR Aluminum

We Produce Aluminum Slug/Sheet Plate Coil/Small Roll Foil/Color Coated/Mirrored Aluminum

Rich experience

Own factory, easy control
over delivery and quality

7*24 hours

Our service runs throughout
the whole production process

Accept inspection

Third party inspection
on-site inspection

Multiple payment terms

TT, LC, DP

Get An Instant Quotation

Please fill in the form below(* are required) to send us a brief message, we will get back to you as soon as possible.